Posted inBrynteg Renovations April 2018 Posted by By Brynteg November 17, 2019 Although not quite warm, the snow has gone and the continuation of removing plaster from the downstairs bedroom and lounge. This is what the bedroom looks like now. The stone here is stunning. This is what the lounge looked like before….…and now the character of the stone is bursting out. Lounge fire – April 2018 Related Brynteg Built in 1901, Brynteg is set in a peaceful rural area with open countryside which has plenty of natural wildlife. View All Posts Post navigation Previous Post March 2018Next PostMay 2018